Revisión separador / CN 140 separator revision
CN 140 separator revision
Valid for 2 days of work
2 days of work review for VITROSEP CN140 system, including the following tasks:
Separator:
- Check filtering sleeves
- Check rubber handles
- Check Spikes
- Check valves
- Check butterfly and elastomer valve
- Check amplifiers and optical sensors
- Check water and air losses
- Check air pressure
- Calibrate the dosage of VITROCOOL and VITROBAC
- Checking dosing bombs VITROCOOL and VITROBAC
- Check whole water cycle
- Check the expiration of VITROBAC and VITROCOOL
- Check consumable stock and spare parts
- Take pictures of the separator and screen
Main Slide:
- Check water color
- Clean pump filters
- Clean cleaning valves
- Check the operation of the pumps
- Check the operation of agitators
- Check the water level probes
- Checking the pressure of the collectors
- Check dosage of VITROCOOL when the deposit is filled
- Check the level of VITROCOOL
- Check the dosage of VITROBAC after expulsion
- Check the particles held in the inox filter
- Take pictures
Numerical Control Slide:
- Check water quality
- Check bomb pressure
- Check the filters of the numerical control pump
- Check the water level probes
- Take pictures
* Travel expenses, allowances and accommodation not included*
*Consumables and spare parts not included*
*The consumables and spare parts replaced by new ones will be billed*
2 days of work review for VITROSEP CN140 system, including the following tasks:
Separator:
- Check filtering sleeves
- Check rubber handles
- Check Spikes
- Check valves
- Check butterfly and elastomer valve
- Check amplifiers and optical sensors
- Check water and air losses
- Check air pressure
- Calibrate the dosage of VITROCOOL and VITROBAC
- Checking dosing bombs VITROCOOL and VITROBAC
- Check whole water cycle
- Check the expiration of VITROBAC and VITROCOOL
- Check consumable stock and spare parts
- Take pictures of the separator and screen
Main Slide:
- Check water color
- Clean pump filters
- Clean cleaning valves
- Check the operation of the pumps
- Check the operation of agitators
- Check the water level probes
- Checking the pressure of the collectors
- Check dosage of VITROCOOL when the deposit is filled
- Check the level of VITROCOOL
- Check the dosage of VITROBAC after expulsion
- Check the particles held in the inox filter
- Take pictures
Numerical Control Slide:
- Check water quality
- Check bomb pressure
- Check the filters of the numerical control pump
- Check the water level probes
- Take pictures
* Travel expenses, allowances and accommodation not included*
*Consumables and spare parts not included*
*The consumables and spare parts replaced by new ones will be billed*